GDOT Construction — Hammond Exit (Exit 5, Hwy 400) Information
– Hammond Ramp info for those coming to us from north of our office –
– Hammond Ramp info for those coming to us from north of our office –
The Edison Prep office is just outside the perimeter near where Glenridge hits Hammond Drive. Hammond Drive is Exit 5 on Highway 400 (Highway 19).
As you likely have seen, GDOT is doing a large construction project at I-285 & 400. From late 2026 to early 2028, they are modifying the existing Exit 5 Ramp with a temporary detour. Many Facebook and NextDoor posts have made the changes sound very scary; they are not a big issue! See the diagram below. All that basically happens is that instead of getting off where you used to get off for the North Springs MARTA exit, you get off about 1.5 miles further south closer to Hammond Drive.
See the graphic below!
Specifically:
If you normally come from Hammond Drive (e.g. Dunwoody, or from 400 Southbound getting off at Hammond, or East Cobb, et al) or other surface roads to the north of our office, there are likely never any GDOT impacts.
Questions?
Call 404-333-8573 or email [email protected].